From: Frank Lundy, P.E., County Engineer
Mark Acreman, P.E., Assistant County Engineer
Tucker Stuart, P.E., Construction Engineer
Mike Campbell, Engineering Technician II
Submitted by: Amanda Brannan, Operations Support Specialist II
______________________________________________________________________
ITEM TITLE
Title
License Agreement #24017 - Perdido Bay Park - Right-of-Way
End
STAFF RECOMMENDATION
Recommendation
Approve License Agreement #24017 permitting W. Shane Osmer to fill in a gully on Perdido Bay Park right-of-way for stabilization.
The term of this agreement shall commence on the date of full execution. License for installation shall terminate at 11:59 p.m. on December 31, 2024. License for maintenance shall be indefinite according to the terms of the agreement.
End
BACKGROUND INFORMATION
Background: W. Shane Osmer desires to fill in a gully located on Perdido Bay Park right-of-way and matching grades of the surrounding area. Solid sod will then be placed for permanent stabilization. Any damage to County property shall be repaired to the previous state or improved as required by Baldwin County. Appropriate erosion and sediment control practices shall be utilized, and no clearing shall take place. All improvements constructed by Licensee shall be maintained by the Licensee for any and all portions of the property that is not County maintained. The Licensee shall have the property surveyed and staked prior to performing work. Any further development shall not be allowed until a new agreement is obtained.
Previous Commission action/date: N/A
FINANCIAL IMPACT
Total cost of recommendation: N/A
Budget line item(s) to be used: N/A
If this is not a budgeted expenditure, does the recommendation create a need for funding? N/A
LEGAL IMPACT
Is legal review necessary for this staff recommendation and related documents?
N/A
Reviewed/approved by: N/A
Additional comments: Standard agreement used as previously approved by Laura Coker (02/11/2020) los
ADVERTISING REQUIREMENTS
Is advertising required for this recommendation? N/A
If the proof of publication affidavit is not attached, list the reason: N/A
FOLLOW UP IMPLEMENTATION
For time-sensitive follow up, select deadline date for follow up: N/A
Individual(s) responsible for follow up: Administration Staff prepare correspondence and have license agreement executed by the Chairman. Send correspondence with original agreement to Tucker Stuart. Mike Campbell will issue the license agreement and conduct all necessary follow-up inspections on work performed.
Action required (list contact persons/addresses if documents are to be mailed or emailed):
W. Shane Osmer
3148 Atlanta Highway
Dallas, Georgia 30132
Additional instructions/notes: Administration - Upload agreement to Contracts with Tucker Stuart as Originator.