ITEM TITLE
Title
Speed Limit Reduction and Pedestrian Safety Improvements on County Road 68
End
STAFF RECOMMENDATION
Recommendation
Take the following actions:
1) Approve reducing the speed limit on County Road 68 (from State Route 161, aka Baldwin Beach Express, west approximately 2,200 feet) from 45 MPH to 35 MPH; and
2) Approve the installation of a raised pedestrian crossing and flashing, solar-powered pedestrian warning signage on County Road 68 for an approximate cost of $45,000.00.
End
BACKGROUND INFORMATION
Background: The Baldwin County Highway Department has observed the need for additional safety improvements on County Road 68 for an existing pedestrian crossing just west of State Route 161 (aka Baldwin Beach Express). Continuous increases in traffic have warranted a reevaluation of this segment of roadway. Based upon a recently completed speed study, Highway Staff is recommending the following safety improvements: a reduction of the posted speed limit from 45 MPH to 35 MPH; a raised pedestrian crosswalk; and replacement of the existing signage with flashing, solar-powered pedestrian warning signs.
Previous Commission action/date: N/A
FINANCIAL IMPACT
Total cost of recommendation: $45,000.00 (approximate cost)
Budget line item(s) to be used: 11153000.55914 Safety Improvement Projects
If this is not a budgeted expenditure, does the recommendation create a need for funding? N/A
LEGAL IMPACT
Is legal review necessary for this staff recommendation and related documents?
N/A
Reviewed/approved by: N/A
Additional comments: N/A
ADVERTISING REQUIREMENTS
Is advertising required for this recommendation? N/A
If the proof of publication affidavit is not attached, list the reason: N/A
FOLLOW UP IMPLEMENTATION
For time-sensitive follow up, select deadline date for follow up: N/A
Individual(s) responsible for follow up: Highway Department will facilitate pedestrian safety improvements and replacement of speed limit signage.
Action required (list contact persons/addresses if documents are to be mailed or emailed): N/A
Additional instructions/notes: N/A