Baldwin County, Alabama
File #: 25-0543    Version: 1
Agenda section: Consent Status: Passed
File created: 2/21/2025 Meeting type: Baldwin County Commission Regular
On agenda: 3/5/2025 Final action: 3/5/2025
Agenda item title: Construction Engineering and Inspection Services for Surfside Shores Drive Drainage Improvements
Attachments: 1. Thompson Engineering-CE&I Services Proposal, 2. Map

Meeting Type:   BCC Regular Meeting

Meeting Date:  3/5/2025

Item Status:   New

From: Frank Lundy, P.E., County Engineer
           Mark Acreman, P.E., Assistant County Engineer

           Tucker Stuart, P.E., Operations Manager
           Josh Bell, P.E., Construction Engineer

Submitted by:  Amanda Brannan, Operations Support Specialist II

______________________________________________________________________

 

ITEM TITLE

Title

Construction Engineering and Inspection Services for Surfside Shores Drive Drainage Improvements

End

STAFF RECOMMENDATION

Recommendation

Approve on-call consultant, Thompson Engineering, Inc., to perform Construction Engineering and Inspection (CE&I) Services for the Surfside Shores Drive Drainage Improvements Project with CE&I fees not to exceed $237,535.99.

End

BACKGROUND INFORMATION

 

Background:  The Highway Department has selected Thompson Engineering, Inc., to perform CE&I services for the Surfside Shores Drive Drainage Improvements Project.

 

Surfside Shores is located on the Fort Morgan peninsula between Morgantown and Kiva Dunes, just west of Gulf Shores, Alabama. There have been numerous localized flooding events with impacts to septic systems in several areas along the east-west streets, primarily Palmetto Drive and Driftwood Drive. This project will construct a closed stormwater system that will utilize overflow structures at each pond to discharge runoff into a main trunk line along Surfside Drive. Once completed, the improvements will reduce time and severity of the localized flooding. This project will have positive impacts to over 200 existing properties.

 

Previous Commission action/date:  September 17, 2024 - The Commission awarded the bid for Project No. HW21179000 - Surfside Drive Drainage Improvements to the lowest bidder, Parten Smith, Inc., in the Bid Amount $2,700,000.00; Construction Time: 175 working days; and authorized the Chairman to execute the Contract.

 

December 20, 2022 - The Commission approved the allocation of American Rescue Plan Act (ARPA) funds in the amount of $2,763,273.00 for the cost of the Surfside Shores Drainage Improvement Project, to include the installation of closed stormwater system, utilizing overflow systems at ponds to discharge water away from the site and to prevent ongoing flooding and impacts to septic systems; and adopted Resolution #2023-043 of the Baldwin County Commission allocating up to $2,763,273.00 of the American Rescue Plan Act (ARPA) funds for the Surfside Shores Drainage Improvement Project.

 

December 20, 2022 - The Commission approved the Purchasing Director to place a competitive bid for the Surfside Shores Drainage Improvements Project; and approved the Chairman to execute any project related documents.

 

September 20, 2022 - The Commission adopted Resolution #2022-165 and approved the Fiscal Year 2022 Budget allocating $1,725,000.00 for the Surfside Shores Drive Drainage Improvements Project.

 

FINANCIAL IMPACT

 

Total cost of recommendation:  Not to exceed $237,535.99

 

Budget line item(s) to be used:  HW21179000.4CONTRCN.4CONTRSRV.4CEICONS

 

If this is not a budgeted expenditure, does the recommendation create a need for funding?  N/A

 

LEGAL IMPACT

 

Is legal review necessary for this staff recommendation and related documents? 

N/A

 

Reviewed/approved by:  N/A

 

Additional comments:  N/A

 

ADVERTISING REQUIREMENTS

 

Is advertising required for this recommendation?  N/A

 

If the proof of publication affidavit is not attached, list the reason: N/A

 

FOLLOW UP IMPLEMENTATION

 

For time-sensitive follow up, select deadline date for follow up:  N/A

 

Individual(s) responsible for follow up:  Upon approval, the Highway Department will issue a Notice to Proceed to Thompson Engineering, Inc.

 

Action required (list contact persons/addresses if documents are to be mailed or emailed):  N/A

 

Additional instructions/notes:  N/A