Agenda item title: Emergency Watershed Protection (EWP) Funding for Damage to Watersheds Resulting from Tropical Storm Gordon
Attachments: 1. Etta Smith Road - EWP letter, 2. Etta Smith Road - Map, 3. Turberville Lane - EWP letter, 4. Turberville Lane - Map, 5. *GN1 - Presentation on EWP Funding for Damage to Watersheds Resulting from Tropical Storm Gordon

Meeting Type:   BCC Regular Meeting

Meeting Date:  2/5/2019

Item Status:   New

From: Joey Nunnally, P.E. County Engineer

Submitted by:  John Sedlack, Design Tech III

______________________________________________________________________

 

ITEM TITLE

Title

Emergency Watershed Protection (EWP) Funding for Damage to Watersheds Resulting from Tropical Storm Gordon

Body

 

STAFF RECOMMENDATION

Recommendation

Approve the Chairman to submit letters to the Natural Resources Conservation Services requesting EWP funding for repairs to two (2) Watersheds located in Baldwin County.

End

 

BACKGROUND INFORMATION

 

Previous Commission action/date:  N/A

 

Background:  On September 4, 2018, Watersheds located near Etta Smith Road and Turberville Lane suffered impairment due to significant rainfall. Securing these funds will allow Baldwin County to perform much needed repairs to prevent future damage to public roads and property.

 

The estimated construction cost to repair the Etta Smith Road head cut is $250,000.00. EWP funds, if awarded, will cover up to 75% (or $187,500.00) of the construction cost. The County’s construction match would be $62,500.00. EWP funds will cover up to $18,750.00 in design and Construction Engineering and Inspection (CE&I) costs (7.5% of construction). The balance of engineering costs will be borne by the County.

The estimated construction cost to repair the Turberville Lane head cut is $250,000.00. EWP funds, if awarded, will cover up to 75% (or $187,500.00) of the construction cost. The County’s construction match would be $62,500.00. EWP funds will cover up to $18,750.00 in design and Construction Engineering and Inspection (CE&I) costs (7.5% of construction). The balance of engineering costs will be borne by the County.

The Etta Smith Road location was on the April 19, 2018 and July 19, 2018 Road and Bridge meeting agendas to discuss the erosion issue with property owners and locate possible funding. No Commission action has been taken.

 

FINANCIAL IMPACT

 

Total cost of recommendation:  N/A

 

Budget line item(s) to be used:  N/A

 

If this is not a budgeted expenditure, does the recommendation create a need for funding?  N/A

 

LEGAL IMPACT

 

Is legal review necessary for this staff recommendation and related documents? 

N/A

 

Reviewed/approved by:  N/A

 

Additional comments:  N/A

 

ADVERTISING REQUIREMENTS

 

Is advertising required for this recommendation?  N/A

 

If the proof of publication affidavit is not attached, list the reason: N/A

 

FOLLOW UP IMPLEMENTATION

 

For time-sensitive follow up, select deadline date for follow up:  N/A

 

Individual(s) responsible for follow up:   Joey Nunnally; to follow-up with funding approval and project completion.

 

Action required (list contact persons/addresses if documents are to be mailed or emailed): 

 

Mail to:

Ben Malone

State Conservationist

Natural Resources Conservation Services

3381 Skyway Drive

Auburn, Alabama 36830

 

Email:

 msbrown@baldwincountyal.gov

 jsedlack@baldwincountyal.gov

 

Additional instructions/notes:  N/A