Agenda item title: Baldwin County Stormwater Detention Management and Improvements - Engineering Services
Attachments: 1. Hydro Engineering Proposal - Stormwater Detention Management and Improvements Planning, 2. Regional Detention Study - Map, 3. BC Policy #9.10 - Engineering, Environmental Monitoring and Surveying Services

Meeting Type:    BCC Regular Meeting

Meeting Date:  8/16/2022

Item Status:   New

From: Joey Nunnally, P.E., County Engineer; Seth Peterson, P.E., Pre-Construction Manager
Submitted by:  Kristopher Deese, Design Tech I

______________________________________________________________________

 

ITEM TITLE

Title

Baldwin County Stormwater Detention Management and Improvements - Engineering Services                                             

End

STAFF RECOMMENDATION

Recommendation

Take the following actions:

1)  Waive Baldwin County Commission Policy #9.10 - Engineering, Environmental Monitoring and Surveying Services; and

2)  Approve on-call consultant Hydro Engineering Solutions (Hydro, LLC) to perform a regional detention study evaluating specific locations with fees not to exceed $153,000.00.                            

End

BACKGROUND INFORMATION

 

Background:  In the strategic plan adopted by Baldwin County on September 15, 2020, a strategic priority is protecting the natural environment by reducing runoff and flooding through the implementation of a regional retention system for stormwater. Hydro Engineering Solution’s proposal will evaluate potential locations as a part of this priority. The proposed fee of $153,000.00 exceeds the $100,000.00 limit outlined in Baldwin County Policy #9.10, therefore, staff is requesting that this policy is waived.

Previous Commission action/date:  N/A

 

FINANCIAL IMPACT

 

Total cost of recommendation:  $153,000.00

 

Budget line item(s) to be used:  HW22028-1PRECN-1CONTR SRV-1CONT111

 

If this is not a budgeted expenditure, does the recommendation create a need for funding?  N/A

 

LEGAL IMPACT

 

Is legal review necessary for this staff recommendation and related documents? 

N/A

 

Reviewed/approved by:  N/A

 

Additional comments:  N/A

 

ADVERTISING REQUIREMENTS

 

Is advertising required for this recommendation?  N/A

 

If the proof of publication affidavit is not attached, list the reason: N/A

 

FOLLOW UP IMPLEMENTATION

 

For time-sensitive follow up, select deadline date for follow up:  N/A

 

Individual(s) responsible for follow up:  Upon Commission approval, Highway Department will issue Notice to Proceed to Hydro Engineering Solutions.

 

Action required (list contact persons/addresses if documents are to be mailed or emailed):  N/A

 

Additional instructions/notes:  N/A